Carbon Fibre Installation

SCOPE OF WORK: 

  • Mobilisation to remote site.

  • Detailed survey/inspection of concrete condition. 

  • Surface preparation to all locations to have carbon fibre installed.

  • Installation of 780 lineal meters of 1.4mm x 120mm carbon fibre laminate.

  • All works completed ahead of schedule and under budget.

  • All quality control documentation completed and submitted at project completion.

CLIENT: 

     http://www.watpac.com.au/

Side View_ Louge River Bridge
Louge River Bridge_Watpac
Carbon Fibre Laminate_Louge River Bridge
Carbon Fibre Laminate 2 _Louge River Bridge

© 2016 by Precision Systems