INSTALLATION OF FLOOR JOINT SEALANT
SCOPE OF WORK:
-
Prepare and clean joints.
-
Repair damaged joint edges.
-
Tape Joints and install jointing suitable expansion foam and backing rod to correct joint design.
-
Install joint sealant using a fact cure durable polyurethane sealant tooled off for aesthetic appearance and to suitable heights to protect from damage but at the same time prevent trip hazards.
-
All sealant was installed to exposed aggregate paving.
PRODUCT:
Precision Systems installed a fast cure durable new polyurethane sealant to minimise pedestrian damage during installation.
![]() | ![]() |
---|---|
![]() | ![]() |