INSTALLATION OF FLOOR JOINT SEALANT

SCOPE OF WORK:

  • Prepare and clean joints.

  • Repair damaged joint edges.

  • Tape Joints and install jointing suitable expansion foam and backing rod to correct joint design.

  • Install joint sealant using a fact cure durable polyurethane sealant tooled off for aesthetic appearance and to suitable heights to protect from damage but at the same time prevent trip hazards.

  • All sealant was installed to exposed aggregate paving.

PRODUCT:

Precision Systems installed a fast cure durable new polyurethane sealant to minimise pedestrian damage during installation.